More Resources
-
July 23, 2026Remove/Repair fan baseplate and motor from 903-C fan and replace in 903-A fan if the fan malfunctions.…Office of NEPA Policy and Compliance
-
July 23, 2026This project consists of milling the existing asphalt parking lots located at 704-N, removing and disposing of milled materials, preparing the surf…Office of NEPA Policy and Compliance
-
DocumentJuly 23, 2026Monitor stream discharge to investigate whether appropriate size basins can be designed to buffer these streams from further structural damage from…Office of NEPA Policy and Compliance
-
July 23, 2026Building 731-N habitability improvements due to normal wear and tear over the years.…Office of NEPA Policy and Compliance
-
July 23, 2026Install a new circuit from Panel B at 705-N including a light switch and nine outdoor LED lights. Also, install an additional receptacle in the rig…Office of NEPA Policy and Compliance
-
July 23, 2026Water flowing over Beaufort Road during heavy rain has caused the roadway surface to washout and become unpassable. Two culverts will be installed …Office of NEPA Policy and Compliance
-
July 23, 2026This scope covers the removal and replacement of the Webb plate roller in building 717-1N.…Office of NEPA Policy and Compliance
-
July 22, 2026The Golden Field Office was designated a Department of Energy (DOE) field office in December 1992 to support the development and commercialization ofOffice of Critical Minerals and Energy Innovation
-
July 22, 2026Secretary of Energy Chris Wright announced that Chief of Staff Carl Coe will step down, and that Charlie Dankert will serve as the Department of Energy's next Chief of Staff.Energy.gov