February 29, 2024The scope of the Naval Reactors Facility (NRF) Control System Upgrades/Modifications to the Cask Shipping and Receiving Facility (CSRF) to Support the Buffering of M-290 Shipping Containers with A1G Spent Nuclear Fuel Assemblies Project covers temporary control system upgrades and modifications at the CSRF so the facility can operate as a radiological facility to support unloading A1G spent nuclear fuel assemblies from M290 shipping containers, and repackaging of the fuel assemblies into canisters and protective overpacks for temporary storage (i.e., buffering) until the fuel assemblies can be processed at a later date in the Naval Spent Fuel Handling Facility.Office of NEPA Policy and Compliance
-
December 12, 2023Hanford Mission Integration Solutions (HMIS) and their subcontractors perform activities undertaken to (1) qualify equipment for use or improve sys…Office of NEPA Policy and Compliance
-
November 27, 2023Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…Office of NEPA Policy and Compliance
-
October 18, 2023Mk-18A Equipment Qualification/Shipment Preparedness…Office of NEPA Policy and Compliance
-
DocumentAugust 28, 2023The K-Area Protected Area Entry Control Facility-3 (ECF) Support Diesel Generator/Pad, etc. will be protected from casual entry via an installed fe…Office of NEPA Policy and Compliance
-
August 8, 2023Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…Office of NEPA Policy and Compliance
-
August 3, 2023Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…Office of NEPA Policy and Compliance
-
July 13, 2023Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer models…Office of NEPA Policy and Compliance
-
February 16, 2023This Amended Determination follows the approval of additional funds and extended project schedule to support the project teams small-scale, researc…Office of NEPA Policy and Compliance
-
DocumentDecember 13, 2022Hanford Mission Integration Solutions (HMIS) and their subcontractors perform activities undertaken to (1) qualify equipment for use or improve sys…Office of NEPA Policy and Compliance