More Resources
-
December 17, 2025Replace light fixtures with LEDs at 717-10N SRMC storage side and remove/reattach signage currently attached to fire protection waterlines to walls…Office of NEPA Policy and Compliance
-
December 17, 2025This scope covers renovations required on the exterior of Building 713-6N.…Office of NEPA Policy and Compliance
-
December 17, 2025Change Out Nickel Cadmium Battery on diesel generator 154-5K with a new maintenance free lead acid battery.…Office of NEPA Policy and Compliance
-
December 17, 2025Clear underbrush west of 719-H as a potential location for a covered refrigerant shed for SRTE. Rev. 1 - Revising to update location of storage loc…Office of NEPA Policy and Compliance
-
December 17, 2025The Advanced Reactive System Screening Tool (ARSST) will be used for the qualification of a new batch of Reillex HPQ Resin. Testing in the ARSST is…Office of NEPA Policy and Compliance
-
December 17, 2025Detection of water content of calcium chloride from the salt pressing or pyro processes.…Office of NEPA Policy and Compliance
-
December 17, 2025America’s nuclear energy workforce is poised for rapid growth as the nation enters a nuclear renaissance guided by President Trump’s executive orders.Office of Nuclear Energy
-
December 17, 2025Solar permitting and inspection refer to two processes that need to happen before a solar array can receive permission to interconnect to the grid and start producing electricity.Integrated Energy Systems Office
-
DocumentDecember 17, 2025The purpose of this Project Task Statement is to define the scope of work required to support Deployable Energy’s experimental objectives. This inc…Office of NEPA Policy and Compliance