More Resources
-
May 21, 2002Vegetation Management along the Raymond – Cosmopolis Transmission Line would include danger tree removal within some areas adjacent to the right-of-way (ROW) (May 2002)Office of NEPA Policy and Compliance
-
DocumentMay 21, 2002Transmission System Vegetation Management ProgramOffice of NEPA Policy and Compliance
-
May 21, 2002This memo is clarification on the reporting of beryllium sensitization and chronic beryllium disease as required by 850.34(g) of the 10 CFR 850.Office of Environment, Health, Safety & Security
-
May 20, 2002Bonneville Power Administration proposes to partially fund a project with the Union County Soil and Water Conservation District that will relocate 4,500 feet of existing dike along the Grande Ronde River, re-create native wetlands, relocate an existing powerline, and establish a riparian forest buffer.Office of NEPA Policy and Compliance
-
DocumentMay 20, 2002Watershed Management Program - Eisminger/ CREP Dike RelocationOffice of NEPA Policy and Compliance
-
May 16, 2002Kangley-Echo Lake Transmission Line ProjectOffice of NEPA Policy and Compliance
-
May 15, 2002BPA proposes to purchase a conservation easement on approximately 16 acres of the Canby Ferry parcel in Clackamas County, Oregon for the protection of wetland, riparian, and riverine habitats. This project is part of a multi-agency effort to protect Willamette River frontage and to connect existing Oregon State Park lands with recreational trails. Once the conservation easement is finalized, a management plan will be developed for the Canby Ferry parcel and adjacent parcels, including the Fish Eddy parcel and the Molalla State Park parcel. Future management actions on these lands will likely involve wildlife habitat and riparian area enhancement, restoration, and preservation activities.Office of NEPA Policy and Compliance
-
DocumentMay 15, 2002Wildlife Mitigation ProgramOffice of NEPA Policy and Compliance
-
DocumentMay 13, 2002From 1952 to 1989, the Rocky Flats Environmental Technology Site (Rocky Flats) produced nuclear weapons components for the Department of Energy. In January 1992, the primary mission of the site changed from nuclear weapons production to site cleanup and closure. A prerequisite to closure is the removal of 9,800 kilograms of plutonium metals and oxides stored at the site. Rocky Flats estimates that these metals and oxides will be packaged into 1,900 containers which, as currently planned, will be shipped to the Department's Savannah River SiteOffice of Inspector General
-
DocumentMay 13, 2002The Plutonium Stabilization and Packaging System at the Rocky Flats Environmental Technology SiteOffice of Inspector General