More Resources
-
November 18, 2002Bonneville Power Administration (BPA) is funding ongoing studies, research, and artificial production of coho salmon in the Wenatchee and Methow river basins. BPA analyzed environmental impacts of these activities in the Mid-Columbia Coho Reintroduction Feasibility Project Final EA, completed in April 1999 (DOE/EA-1282). Supplemental Analyses (DOE/EA-1282/SA-01 and -02) were prepared in April 2001 to analyze effects of additional activities proposed for the project, and in October 2001 for the Peshastin Incubation Facility. In March 2002 BPA categorically excluded dredging behind Dam 5 at the Leavenworth Fish Hatchery in connection with the projectOffice of NEPA Policy and Compliance
-
DocumentNovember 18, 2002Mid-Columbia Coho Reintroduction Feasibility ProjectOffice of NEPA Policy and Compliance
-
November 18, 2002Waste Isolation Pilot Plant Disposal PhaseOffice of NEPA Policy and Compliance
-
DocumentNovember 18, 2002Since 1992, the Department of Energy (Department) and the National Nuclear Security Administration (NNSA) have carried out an analytically-based Stockpile Surveillance Program to help ensure the safety, reliability, and performance of the nuclear weapons in the Nation's stockpile. On a continuing basis, NNSA randomly selects weapons from the active inventory for disassembly, inspection, and testing for defects and problems. Test results serve, in part, as a basis for certifying to the President that there is no need to resume underground nuclear testing. When the surveillance program identifies a suspected problem, NNSA must determine if further testing and analysis is warranted. If so, a Significant Finding Investigation (SFI) is opened. Weapons experts at one of the Department's defense laboratories generally conduct the SFI and are charged with determining the severity of the problem and whether further action is required.Office of Inspector General
-
DocumentNovember 18, 2002Resolution of Significant Finding Investigation RecommendationsOffice of Inspector General
-
November 15, 2002IAEA-TECDOC-1329 Safety Culture in Nuclear Installations, Guidance for use in the Enhancement of Safety CultureOffice of Environment, Health, Safety & Security
-
November 15, 2002Availability of draft DOE/EIS-0323, which analyzed Sacramento Area Voltage Support.Office of NEPA Policy and Compliance
-
DocumentNovember 14, 2002In August 2002, the Department of Energy (Department) formalized its plan to permanently disable the only domestic facility capable of producing electromagnetically enriched stable isotopes. The Department intended to dismantle the equipment in the facility, called calutrons, and rely on existing isotope inventories, isotopes produced by Russia, or the adaptation of other isotope separation technologies to meet the domestic demand for stable isotopes. This plan was based on the premise that the calutrons were excess to mission needs and not economical.Office of Inspector General
-
DocumentNovember 14, 2002Calutron Isotope Production CapabilitiesOffice of Inspector General
-
Finding of No SIgnificant Impact Ground Water Complinace at the Durango, Colorado UMTRA Project SiteDocumentNovember 13, 2002The Department of Energy plans to implement a ground water compliance strategy for the Uranium Mill Traillings Remedial Action Project site near Durango, Colorado.Office of NEPA Policy and Compliance