More Resources

  • February 18, 2003
    Proposed Changes to the Sanitary Biosolids Land Application Program on the Oak Ridge Reservation
    Office of NEPA Policy and Compliance
  • February 16, 2003
    The U.S. Department of Energy (DOE) proposes to raise the biosolids land application radionuclide loading limits from the current, self-imposed 4 mrem/yr lifetime loading to the Tennessee Department of Environment and Conservation (TDEC)-approved level of 10 mrem/yr. The planning level increase is necessary for industrial development within the Oak Ridge community. In addition, DOE proposes to allow the discharge of treated wastewaters from the West End Treatment Facility (WETF) to the Y-12 Plant and City of Oak Ridge sanitary sewer systems, resulting in an operational cost savings of approximately $133,000 per year.
    Office of NEPA Policy and Compliance
  • February 16, 2003
    Proposed Changes to the Sanitary Sludge Land Application Program on the Oak Ridge Reservation, Oak Ridge, Tennessee
    Office of NEPA Policy and Compliance
  • February 12, 2003
    The objective of this inspection was to determine if the 2001 Safeguards and Security Survey of Los Alamos National Laboratory was compromised as alleged.
    Office of Inspector General
  • February 12, 2003
    Inspection Report to Management on Inspection of 2001 Safeguards and Security Survey of Los Alamos National Laboratory
    Office of Inspector General
  • February 12, 2003
    Hanford Site Solid (Radioactive and Hazardous) Waste Program
    Office of NEPA Policy and Compliance
  • February 12, 2003
    Vegetation Management along the Murry-Custer No.1 transmission line from structure 1/1 through structure 6/2
    Office of NEPA Policy and Compliance
  • February 12, 2003
    EIS-0286-NOI-2003
    Office of NEPA Policy and Compliance
  • February 12, 2003
    The Office of Independent Oversight and Performance Assurance (OA) conducts reviews of Department of Energy (DOE) facilities and operations to evaluate the status of, among other things, safeguards and security matters. Integral to these reviews are force-on-force performance tests. These are major tests of the overall effectiveness of all site safeguards and security elements involved in responding to a hypothetical threat scenario based on the design basis threat1 and identified site-specific threats. These tests employ an adversary team that tests the skills, procedures and equipment of those forces responsible for protecting DOE site security interests. The objective of our inspection was to determine if DOE has taken corrective actions to address findings resulting from recent forceon- force performance tests that were conducted at the Pantex Plant (Pantex) during January 24-March 17, 2000, and at Los Alamos National Laboratory’s (LANL’s) Technical Area 18 during October 2-12, 2000.
    Office of Inspector General
  • February 12, 2003
    Inspection of Implementation of Corrective Actions Resulting From Force-on-Force Performance Tests
    Office of Inspector General