More Resources

  • February 21, 2003
    Our review of 11 major projects (see Appendix 1) disclosed that information systems development activities were not always consistent with Federal requirements or guidance. We found development problems with nine of the projects. For example: • Key planning activities such as cost-benefit analyses had not been performed for eight of the projects we reviewed; • Evaluations of suitability of potential software solutions were often inadequate or had not been performed; • Many projects were not adequately monitored and controlled throughout their lifecycle, and project baselines and plans were not revisited in light of scope changes or delays; and, • For 6 of the 11 projects reviewed, reengineering studies designed to improve business processes before beginning development had not been conducted. In addition, Bonneville and Western did not consistently include all relevant project costs in accounting for its development efforts.ioactiv
    Office of Inspector General
  • February 21, 2003
    Information System Development Practices at the Bonneville and Western Area Power Administrations
    Office of Inspector General
  • February 20, 2003
    Transmission System Vegetation Management Program
    Office of NEPA Policy and Compliance
  • February 19, 2003
    Vegetation Management for the Alvey Fairview 230kV transmission line from structure 1/1 through structure 64/7
    Office of NEPA Policy and Compliance
  • February 19, 2003
    This Supplement Analysis (SA) has been prepared to determine if previous Department of Energy (DOE), National Nuclear Security Administration (NNSA) environmental assessments (EAs), including EA-1429 Environmental Assessment for Proposed Access Control and Traffic Improvements at Los Alamos National Laboratory, Los Alamos, New Mexico adequately address the environmental effects of a proposed modification to the location and alignment of a bypass road at Technical Area (TA) 3, or if this EA or others need to be supplemented.
    Office of NEPA Policy and Compliance
  • February 19, 2003
    Security Perimeter Project
    Office of NEPA Policy and Compliance
  • February 19, 2003
    Transmission System Vegetation Management Program
    Office of NEPA Policy and Compliance
  • February 19, 2003
    Audit of the Research and Development Investment Criteria for Fossil Energy
    Office of Inspector General
  • February 19, 2003
    Transmission System Vegetation Management Program
    Office of NEPA Policy and Compliance
  • February 19, 2003
    Transmission System Vegetation Management Program
    Office of NEPA Policy and Compliance