DocumentFebruary 21, 2003Our review of 11 major projects (see Appendix 1) disclosed that information systems development activities were not always consistent with Federal requirements or guidance. We found development problems with nine of the projects. For example: • Key planning activities such as cost-benefit analyses had not been performed for eight of the projects we reviewed; • Evaluations of suitability of potential software solutions were often inadequate or had not been performed; • Many projects were not adequately monitored and controlled throughout their lifecycle, and project baselines and plans were not revisited in light of scope changes or delays; and, • For 6 of the 11 projects reviewed, reengineering studies designed to improve business processes before beginning development had not been conducted. In addition, Bonneville and Western did not consistently include all relevant project costs in accounting for its development efforts.ioactivOffice of Inspector General
-
DocumentFebruary 21, 2003Information System Development Practices at the Bonneville and Western Area Power AdministrationsOffice of Inspector General
-
DocumentFebruary 20, 2003Transmission System Vegetation Management ProgramOffice of NEPA Policy and Compliance
-
February 19, 2003Vegetation Management for the Alvey Fairview 230kV transmission line from structure 1/1 through structure 64/7Office of NEPA Policy and Compliance
-
February 19, 2003This Supplement Analysis (SA) has been prepared to determine if previous Department of Energy (DOE), National Nuclear Security Administration (NNSA) environmental assessments (EAs), including EA-1429 Environmental Assessment for Proposed Access Control and Traffic Improvements at Los Alamos National Laboratory, Los Alamos, New Mexico adequately address the environmental effects of a proposed modification to the location and alignment of a bypass road at Technical Area (TA) 3, or if this EA or others need to be supplemented.Office of NEPA Policy and Compliance
-
DocumentFebruary 19, 2003Security Perimeter ProjectOffice of NEPA Policy and Compliance
-
DocumentFebruary 19, 2003Transmission System Vegetation Management ProgramOffice of NEPA Policy and Compliance
-
DocumentFebruary 19, 2003Audit of the Research and Development Investment Criteria for Fossil EnergyOffice of Inspector General
-