More Resources

  • July 22, 2003
    Ground Water Compliance at the New Rifle, Colorado, UMTRA Project Site
    Office of NEPA Policy and Compliance
  • July 21, 2003
    Kangley-Echo Lake Transmission Line Project
    Office of NEPA Policy and Compliance
  • July 18, 2003
    The Waste Isolation Pilot Plant (WIPP), located near Carlsbad, New Mexico, is the Department of Energy's underground repository for defense-generated Transuranic (TRU) waste. TRU waste consists of items such as clothing, gloves, and tools contaminated with small amounts of radioactive elements. Most TRU wastes can be handled by workers using minimal specialized protective gear and is referred to as "contact-handled" TRU. However, TRU wastes with a surface radiation dose rate greater than 200 millirem per hour must be handled using remote devices and is referred to as "remote-handled. 'I
    Office of Inspector General
  • July 18, 2003
    Disposal of Remote-Handled Transuranic Waste at the Waste Isolation Pilot Plant
    Office of Inspector General
  • July 17, 2003
    Issued to BNFL, Inc. related to potential violations of Quality Assurance Requirements at the East Tennessee Technology Park
    Office of Enterprise Assessments
  • July 17, 2003
    This module outlines basic costing concepts such as control accounts, work packages and planning packages.
    Office of Project Management
  • July 17, 2003
    Guidance to provide assistance in determining whether an action within the scope of an EIS may be taken before a record of decision is issued. The guidance reviews applicable requirements, gives examples of the types of actions that may proceed as interim actions, describes case studies, and outlines the steps in the EIS process for interim actions.
    Office of NEPA Policy and Compliance
  • July 17, 2003
    DOE guidance to provide assistance in determining whether an action within the scope of an EIS may be taken before a record of decision is issued. The guidance reviews applicable requirements, gives examples of the types of actions that may proceed as ...
    Office of NEPA Policy and Compliance
  • July 17, 2003
    This module reviews metrics such as cost and schedule variance along with cost and schedule performance indices.
    Office of Project Management
  • July 17, 2003
    Introduction to a series of online tutorials designed to enhance your understanding of Earned Value Management
    Office of Project Management