More Resources
-
July 22, 2003Ground Water Compliance at the New Rifle, Colorado, UMTRA Project SiteOffice of NEPA Policy and Compliance
-
DocumentJuly 21, 2003Kangley-Echo Lake Transmission Line ProjectOffice of NEPA Policy and Compliance
-
DocumentJuly 18, 2003The Waste Isolation Pilot Plant (WIPP), located near Carlsbad, New Mexico, is the Department of Energy's underground repository for defense-generated Transuranic (TRU) waste. TRU waste consists of items such as clothing, gloves, and tools contaminated with small amounts of radioactive elements. Most TRU wastes can be handled by workers using minimal specialized protective gear and is referred to as "contact-handled" TRU. However, TRU wastes with a surface radiation dose rate greater than 200 millirem per hour must be handled using remote devices and is referred to as "remote-handled. 'IOffice of Inspector General
-
DocumentJuly 18, 2003Disposal of Remote-Handled Transuranic Waste at the Waste Isolation Pilot PlantOffice of Inspector General
-
July 17, 2003Issued to BNFL, Inc. related to potential violations of Quality Assurance Requirements at the East Tennessee Technology ParkOffice of Enterprise Assessments
-
DocumentJuly 17, 2003This module outlines basic costing concepts such as control accounts, work packages and planning packages.Office of Project Management
-
July 17, 2003Guidance to provide assistance in determining whether an action within the scope of an EIS may be taken before a record of decision is issued. The guidance reviews applicable requirements, gives examples of the types of actions that may proceed as interim actions, describes case studies, and outlines the steps in the EIS process for interim actions.Office of NEPA Policy and Compliance
-
DocumentJuly 17, 2003DOE guidance to provide assistance in determining whether an action within the scope of an EIS may be taken before a record of decision is issued. The guidance reviews applicable requirements, gives examples of the types of actions that may proceed as ...Office of NEPA Policy and Compliance
-
July 17, 2003This module reviews metrics such as cost and schedule variance along with cost and schedule performance indices.Office of Project Management
-
July 17, 2003Introduction to a series of online tutorials designed to enhance your understanding of Earned Value ManagementOffice of Project Management