More Resources
-
DocumentJuly 24, 2003Presidential Permit authorizing UNS Electric, Inc. to construct, operate, and maintain electric transmission facilities at the U.S. - Mexico Border.Office of Electricity
-
DocumentJuly 24, 2003Presidential permit authorizing UNS Electric Inc to construct, operate, and maintain electric transmission facilities at the U.S-Mexican border.Office of Electricity
-
DocumentJuly 24, 2003Presidential permit authorizing UNS Electric Inc to construct, operate, and maintain electric transmission facilities at the U.S-Mexican border.Office of Electricity
-
July 22, 2003Ground Water Compliance at the New Rifle, Colorado, UMTRA Project SiteOffice of NEPA Policy and Compliance
-
July 22, 2003Ground Water Compliance at the New Rifle, Colorado, UMTRA Project SiteOffice of NEPA Policy and Compliance
-
DocumentJuly 21, 2003Kangley-Echo Lake Transmission Line ProjectOffice of NEPA Policy and Compliance
-
DocumentJuly 18, 2003The Waste Isolation Pilot Plant (WIPP), located near Carlsbad, New Mexico, is the Department of Energy's underground repository for defense-generated Transuranic (TRU) waste. TRU waste consists of items such as clothing, gloves, and tools contaminated with small amounts of radioactive elements. Most TRU wastes can be handled by workers using minimal specialized protective gear and is referred to as "contact-handled" TRU. However, TRU wastes with a surface radiation dose rate greater than 200 millirem per hour must be handled using remote devices and is referred to as "remote-handled. 'IOffice of Inspector General
-
DocumentJuly 18, 2003Disposal of Remote-Handled Transuranic Waste at the Waste Isolation Pilot PlantOffice of Inspector General
-
July 17, 2003Issued to BNFL, Inc. related to potential violations of Quality Assurance Requirements at the East Tennessee Technology ParkOffice of Enterprise Assessments
-
DocumentJuly 17, 2003This module outlines basic costing concepts such as control accounts, work packages and planning packages.Office of Project Management