DocumentSeptember 9, 2005Docket No. EO-05-01: Pursuant to Rules 212 and 213 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (“FERC” or the “Commission”), 18 C.F.R. §§ 385.212 and 385.213 (2005), Potomac Electric Power Company (“Pepco”) hereby (i) moves for leave to answer and (ii) answers certain of the comments and protests filed in the above-captioned proceeding.Office of Electricity
-
DocumentSeptember 9, 2005Docket No. EO-05-01: Pursuant to Rules 212 and 213 of the Rules of Practice and Procedure of the Federal Energy Regulatory Commission (“FERC” or the “Commission”), 18 C.F.R. §§ 385.212 and 385.213 (2005), Potomac Electric Power Company (“Pe...Office of Electricity
-
DocumentSeptember 9, 2005The sludge removal phase of the Spent Nuclear Fuels (SNF) Project and Cost has experienced schedule delays and cost increases. For example, the original Tri-Party Agreement (TPA) milestone called for sludge removal to begin by December 2002; however, Fluor was unable to begin operations until July 2004 – 18 months later than planned. In April 2003, Fluor initiated the final step towards beginning sludge removal operations. This step, called the Operational Readiness Review (ORR), required an assessment to verify that an adequate state of readiness had been achieved to begin startup of sludge removal operations. Due to numerous deficiencies, the ORR was halted shortly after it started. Deficiencies included instances where installed equipment did not meet construction specifications, testing documentation was either inadequate or nonexistent, and changes were made to equipment designs without an adequate review for potential safety impacts.Office of Inspector General
-
DocumentSeptember 9, 2005Sludge Removal Operations at the Hanford Site's K BasinsOffice of Inspector General
-
September 8, 2005DOE has prepared a Supplement Analysis (SA) pursuant to DOE regulations implementing the National Environmental Policy Act (NEPA) at 10 CFR 1021.314. The SA addresses DOE’s proposal to ship approximately 37 cubic meters (1,307 cubic feet [ft3]) of transuranic (TRU) waste from the Battelle Columbus Laboratory West Jefferson site near Columbus, Ohio, to the Savannah River Site (SRS), a DOE site near Aiken, South Carolina, or to Waste Control Specialists, LLC (WCS), a commercial facility in Andrews, Texas.Office of NEPA Policy and Compliance
-
September 8, 2005Transportation, Storage, Characterization, and Disposal of Transuranic Waste Currently Stored at the Battelle West Jefferson Site Near Columbus, OhioOffice of NEPA Policy and Compliance
-
September 8, 2005Office of NEPA Policy and Compliance
-
September 8, 2005CEQ memorandum provides information on the response to hurricane Katrina, reporting oil and chemical spills . . .Office of NEPA Policy and Compliance
-
September 7, 2005Office of Hearings and Appeals
-
September 7, 2005Written presentation of information regarding the Potomac River power plant that Mirant shared with DOE, PEPCO and PJM at a meeting called by DOE on September 1, 2005.Office of Electricity