  • January 16, 2006
    Docket No. EO-05-01. In summary, PJM understands the difficulty facing the Department in having to balance the important conflicting interests presented here. However, PJM does not regard Option A as anywhere close to striking the correct balance. The ...
    Office of Electricity
  • January 15, 2006
    October-December 2005 Program Update newsletter
    Office of Legacy Management
  • January 13, 2006
    This is a request by JOHN DEERE PRODUCT ENGINEERING for a DOE waiver of domestic and foreign patent rights under agreement DE-FC26-05NT42416.
    Office of the General Counsel
  • January 13, 2006
    Docket No. EO-05-01: Pursuant to Section 202(c) of the Federal Power Act, 16 USC §824a(c), Section 301 (b) of the Department of Energy Organization Act, 42 USC §7151 (b), and Order No. 202-05-3, issued by the Department of Energy ("DOE" or the "Department") on December 20, 2005 ("Order"), Mirant Potomac River, LLC ("Mirant") hereby submits the following Supplement Number 1 to the Operating Plan submitted to the Department on December 30, 2005 (the "Operating Plan") in response to the Order.
    Office of Electricity
  • January 13, 2006
    Docket No. EO-05-01: This report describes dispersion modeling performed for simultaneous operation of three baseload units at Mirant’s Potomac River Generating Station (PRGS). The units (3,4,5) would operate at maximum load (107 MW) for up to 12 hours and minimum load (35 MW) 12 hours or more in a calendar day. This mode of operation is also referred to as Option B in Mirant Potomac River LLC’s December 30, 2005 letter to the U.S. Department of Energy regarding District of Columbia Public Service Commission, Docket No. EO-05-01. The modeling was performed according to the Protocol approved by the Virginia Department of Environmental Quality. The modeling demonstrates that Option B operations will not cause or contribute to exceedances of the National Ambient Air Quality Standards (NAAQS) for the pollutants PM10 and NO2 . The modeling also demonstrates that Option B operations will not cause or contribute to exceedances of the 3 hour or the annual NAAQS for SO2 and predicts only marginal exceedances of the 24 hour SO2 NAAQS. The 24 hour SO2 NAAQS exceedances are predicted only at the top level and roof of the nearby Marina Towers building and only under a limited set of meteorological conditions. In addition, the marginal exceedances of the 24 hour SO2 NAAQS are predicted to be within the required “margin of safety”.
    Office of Electricity
  • January 13, 2006
    Docket No. EO-05-01: This report describes dispersion modeling performed for simultaneous operation of three baseload units at Mirant’s Potomac River Generating Station (PRGS). The units (3,4,5) would operate at maximum load (107 MW) for up to 12 hou...
    Office of Electricity
  • January 13, 2006
    Docket No. EO-05-01: Pursuant to Section 202(c) of the Federal Power Act, 16 USC §824a(c), Section 301 (b) of the Department of Energy Organization Act, 42 USC §7151 (b), and Order No. 202-05-3, issued by the Department of Energy ("DOE" or the "Depar...
    Office of Electricity
  • January 12, 2006
    Docket No. EO-05-01: Appendix A, Field Sampling Data and Appendix B, Field Reduced Data from Final Report: Particulate Emissions Testing, Unit 1, Potomac River Generating Station, Alexandria, Virginia
    Office of Electricity
  • January 12, 2006
    Docket No. EO-05-01: Appendix C, Analytical Data from Final Report: Particulate Emissions Testing, Unit 1, Potomac River Generating Station, Alexandria, Virginia
    Office of Electricity
  • January 12, 2006
    Docket No. EO-05-01: Appendix D: Facility Process Data and Appendix E: Equipment Calibration Data Sheets from Final Report: Particulate Emissions Testing, Unit 1, Potomac River Generating Station, Alexandria, Virginia
    Office of Electricity