More Resources
-
DocumentJanuary 16, 1997Inspection of Alleged Design and Construction Deficiencies in the Nuclear Materials Storage Facility at the Los Alamos National LaboratoryOffice of Inspector General
-
January 16, 1997Office of Hearings and Appeals
-
DocumentJanuary 16, 1997Inspection of Alleged Design and Construction Deficiencies in the Nuclear Materials Storage Facility at the Los Alamos National LaboratoryOffice of Inspector General
-
DocumentJanuary 8, 1997Audit of the U.S. Department of Energy's Identification and Disposal of Nonessential LandOffice of Inspector General
-
January 8, 1997Dry Storage Container System for the Management of Navel Spent Nuclear FuelOffice of NEPA Policy and Compliance
-
January 8, 1997Industrial Wastewater Closure Module for the High-Level Waste Tank 20 SystemSavannah River Site
-
January 6, 1997This Record of Decision has been prepared on the proposed disposal of the defueled S1C Prototype reactor plant, located in Windsor, Connecticut, pursuant to Section 102(2) of the National Environmental Policy Act of 1969 (NEPA), 42 U.S.C. 4321 et seq.), and in accordance with the Council on Environmental Quality regulations implementing NEPA procedures (40 CFR parts 1500–1508), and Department of Energy regulations implementing NEPA procedures (10 CFR part 1021).Office of NEPA Policy and Compliance
-
DocumentJanuary 6, 1997Disposal of the S1C Prototype Reactor PlantOffice of NEPA Policy and Compliance
-
DocumentJanuary 1, 1997Eron Documents 1997, pdf enron1997.pdfOffice of Management
-
January 1, 1997This report described each step in the cycle of nuclear weapons production and defined for the first time a planned disposition path for all waste streams generated prior to 1992 as a result of weapons production.Office of Environmental Management