More Resources

  • December 31, 2006
    The Savannah River Site Environmental Report for 2006 is an overview of effluent monitoring and environmental surveillance activities conducted on...
    Savannah River Site
  • December 28, 2006
    Ohio State University, Ohio 4-H Center with Green Buildling Technologies
    Office of NEPA Policy and Compliance
  • December 26, 2006
    In 1998, legislation was enacted requiring the Department of Energy (Department) to convert the 794,000 metric tons of depleted uranium hexafluoride stored at its gaseous diffusion plants to a more stable form. In August 2002, the Department awarded a contract to IJranium Disposition Services, LLC for the design, construction, and operation of conirersion facilities in Paducah, Kentucky and Portsmouth, Ohio. The Paducah facility was designed with four conversion lines to process its larger inventory o-f depleted uranium hexafluoride, while the Portsmouth facility was designed with three lincs. The Department expected that it would takz approximately 25 years to convert all of the depleted uranium hexafluoride to a more stable form
    Office of Inspector General
  • December 26, 2006
    In 1998, legislation was enacted requiring the Department of Energy (Department) to convert the 794,000 metric tons of depleted uranium hexafluoride stored at its gaseous diffusion plants to a more stable form. In August 2002, the Department awarded ...
    Office of Inspector General
  • December 26, 2006
    In 1998, legislation was enacted requiring the Department of Energy (Department) to convert the 794,000 metric tons of depleted uranium hexafluoride stored at its gaseous diffusion plants to a more stable form. In August 2002, the Department awarded a contract to IJranium Disposition Services, LLC for the design, construction, and operation of conirersion facilities in Paducah, Kentucky and Portsmouth, Ohio. The Paducah facility was designed with four conversion lines to process its larger inventory o-f depleted uranium hexafluoride, while the Portsmouth facility was designed with three lincs. The Department expected that it would takz approximately 25 years to convert all of the depleted uranium hexafluoride to a more stable form.
    Office of Inspector General
  • December 26, 2006
    In 1998, legislation was enacted requiring the Department of Energy (Department) to convert the 794,000 metric tons of depleted uranium hexafluoride stored at its gaseous diffusion plants to a more stable form. In August 2002, the Department awarded ...
    Office of Inspector General
  • December 21, 2006
    Order authorizing Conectiv Energy Supply Inc to export electric energy to Canada.
    Office of Electricity
  • December 21, 2006
    Order authorizing Conectiv Energy Supply Inc to export electric energy to Canada.
    Office of Electricity
  • December 20, 2006
    Docket No. EO-05-01. Order No. 202-07-02: As you are aware, Mirant Potomac River, L.L.C, (Mirant) is operating per the terms and conditions of the Administrative Compliance Order (ACO) dated June 1, 2006. Under the terms of ACO, Mirant is to deliver a monthly report to include: (1) the modeled input files and results of the daily Predictive Modeling for the preceding month, including the hourly average heat input in the MMBtu for each unit and the exit velocity (or exhaust volume) for each unit; (2) verification that the planned Operating Parameters utilized for Predictive Modeling in the preceding month were not exceeded, or if exceeded, documentation describing that exceedance: (3) the inputs and results of the "follow-up" modeling for the preceding month (or portion thereof during which all Monitors were not in place), including the hourly average heat input in MMBtu for each unit and the exit velocity (or exhaust volume) for each unit; and (4) after installation of the Monitors, the data generated by the Monitors. As a result, please see the attached submission, "Mirant Potomac River, LLC Monthly Model Evaluation Study Report" for the month of November 2006.
    Office of Electricity
  • December 20, 2006
    Docket No. EO-05-01. Order No. 202-07-02: As you are aware, Mirant Potomac River, L.L.C, (Mirant) is operating per the terms and conditions of the Administrative Compliance Order (ACO) dated June 1, 2006. Under the terms of ACO, Mirant is to deliver a...
    Office of Electricity