More Resources
-
DocumentApril 26, 2007The Department of Energy relies on contractors to manage and operate its major facilities. Management contractors' business-related travel, which includes domestic and international trips to and from field sites to attend meetings and conferences and to perform research, represents a significant cost to the Department. In Fiscal year (FY) 2006 contractors took over 192,000 trips and incurred total travel related costs of approximately $154 million.Office of Inspector General
-
DocumentApril 26, 2007Management Controls over Selected Facility Contractor Travel ExpensesOffice of Inspector General
-
April 26, 2007U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the issuance of two draft National Interest Electric Transmission Corridor (National Corridor) designations. The Energy Policy Act of 2005 authorizes the Secretary, based on the findings of DOE’s National Electric Transmission Congestion Study (Congestion Study), to designate National Corridors.Office of Electricity
-
DocumentApril 25, 2007Emergency Exercise Feedback FormOffice of Management
-
DocumentApril 25, 2007Form OE-781-R has been developed as an optional form to collect information required by the terms and conditions placed in Presidential permits and electricity export authorizations.Office of Electricity
-
April 25, 2007Office of Electricity
-
DocumentApril 25, 2007Order authorizing Western Systems Power Pool to export electric energy to CanadaOffice of Electricity
-
DocumentApril 25, 2007Order authorizing Western Systems Power Pool to export electric energy to CanadaOffice of Electricity
-
April 24, 2007Application from British Columbia Transmission Corporation to amend Presidential Permit to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border: Federal Register NoticeOffice of Electricity
-
April 24, 2007Office of Electricity