More Resources
-
DocumentDecember 9, 2008Cyber Security Risk Management Practices at the Bonneville Power AdministrationOffice of Inspector General
-
DocumentDecember 9, 2008Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structure presents a distinct set of challenges in transmission planning, siting, cost allocation, grid operations and management, technological innovation, financing and construction. The development and deployment of a national strategy on transmission that meets the needs of all parties is extremely complex; however, a solution is desperately needed.Office of Electricity
-
DocumentDecember 9, 2008Transmission lines are the critical link between the point of electricity generation and consumers. The U.S. transmission grid infrastructure is owned and operated by approximately 3,000 distribution utilities and 500 transmission owners. This structur...Office of Electricity
-
DocumentDecember 9, 2008Demand-side resources serve resource adequacy needs by reducing load, which reduces the need for additional generation. Typically, these resources result from one of two methods of reducing load: energy efficiency or demand response / load management. The energy efficiency method designs and deploys technologies and design practices that reduce energy use while delivering the same service.Office of Electricity
-
DocumentDecember 9, 2008Demand-side resources serve resource adequacy needs by reducing load, which reduces the need for additional generation. Typically, these resources result from one of two methods of reducing load: energy efficiency or demand response / load management. ...Office of Electricity
-
DocumentDecember 9, 2008Chapter 2 Generation AdequacyOffice of Electricity
-
DocumentDecember 9, 2008Chapter 2 Generation AdequacyOffice of Electricity
-
December 8, 2008Office of Hearings and Appeals
-
DocumentDecember 8, 2008This is a request by Siemens Power Generation for a DOE waiver of domestic and foreign patent rights under agreement DE-FC26-98FT40343Office of the General Counsel
-
December 8, 2008The purpose of the Report is to address barriers and opportunities to deploying Smart Grid technologies to enhance the Nation's electric power delivery system to meet the challenges of the 21st century.Office of Electricity