More Resources
-
February 26, 2009Letter from Washington D.C. Mayor Fenty providing Secretary Chu with the assurances needed so that Recovery Act funds can be made available. These assurances are required by Section 410 of the American Recovery and Reinvestment Act of 2009.Energy.gov
-
February 25, 2009Energia Sierra Juarez Transmission ProjectOffice of NEPA Policy and Compliance
-
February 25, 2009A project supported by the Office of Fossil Energy's National Energy Technology Laboratory (NETL) has given rise to a major new research consortium to promote advanced technology for low-impact oil and gas drilling.Hydrocarbons and Geothermal Energy Office
-
DocumentFebruary 25, 2009Energy asset owners are facing a monumental challenge as they address compliance with the North American Electric Reliability Corporation (NERC) Critical Infrastructure Protection (CIP) Standards (CIP-002 through CIP-009). The increased use of wireless technologies and their introduction into control center networks and field devices compound this challenge, as ambiguity exists regarding the applicability of the CIP requirements to wireless networking technologies.Office of Electricity
-
DocumentFebruary 25, 2009Energy asset owners are facing a monumental challenge as they address compliance with the North American Electric Reliability Corporation (NERC) Critical Infrastructure Protection (CIP) Standards (CIP-002 through CIP-009). The increased use of wirele...Office of Electricity
-
February 25, 2009Presidential permit authorizing Energia Sierra Juarex U.S Transmission LLC to construct, operate, and maintain electric transmission facilities at the U.S-Mexico border.Office of Electricity
-
February 24, 2009Letter from Kansas Governor Sebelius providing Secretary Chu with the assurances needed so that Recovery Act funds can be made available. These assurances are required by Section 410 of the American Recovery and Reinvestment Act of 2009.Energy.gov
-
February 23, 2009Construction, Operation, and Maintenance of the Proposed Transmission Agency of Northern California Transmission Project, CaliforniaOffice of NEPA Policy and Compliance