More Resources
-
May 5, 2009McKenzie Electric Cooperative (MEC), through Upper Missouri Generation and Transmission Electric Cooperative, Inc. (UMGT), has applied to the U.S. Department of Energy (DOE) Western Area Power Administration (Western) for a new electrical interconnection. This project would require the construction of temporary interconnection at Western’s Killdeer Substation and a new 115-kilovolt (kV) transmission line which would extend about 13 miles northward from Western’s Killdeer Substation to a new MEC Mountain Substation, all in Dunn County, North DakotaOffice of NEPA Policy and Compliance
-
May 5, 2009Kildeer to Mountain Transmission ProjectOffice of NEPA Policy and Compliance
-
May 5, 2009Subject: Nomination Hearing By: Daniel B. Poneman, Nominee for Deputy Secretary of EnergyOffice of Congressional and Intergovernmental Affairs
-
May 5, 2009Subject: Nomination Hearing By: David B. Sandalow, Nominee for Assistant Secretary for Policy and International AffairsOffice of Congressional and Intergovernmental Affairs
-
DocumentMay 5, 20095_5_09_David_Sandalow_nominee.pdfOffice of Congressional and Intergovernmental Affairs
-
May 4, 2009S. Harris, Economic Recovery Advisor to Secretary Chu, reported contact with a lobbyists from the Free Flow Power Corporation.Energy.gov
-
May 4, 2009Matt Rogers, Senior Advisor to Secretary Chu, reported contact with lobbyists from Arizona, Indiana, Kansas, and the U.S. Virgin Islands.Energy.gov
-
May 4, 2009Matt Rogers, Senior Advisor to Secretary Chu, reporting has contact with a lobbyist from Blue Water Strategies.Energy.gov
-
DocumentMay 4, 2009The Department of Energy’s Oak Ridge National Laboratory (ORNL) conducts cutting edge scientific research. ORNL utilizes removable electronic media, such as computer hard drives, compact disks, data tapes, etc., to store vast amounts of classified information. Incidents involving breakdowns in controls over classified removable electronic media have been a continuous challenge for the Department. The loss of even one piece of such media can have serious national security implications. In 2004, the Department had a complex-wide “stand-down” of all activities using classified removable electronic media, and such media containing Secret/Restricted Data or higher classified data was designated “Accountable Classified Removable Electronic Media” (ACREM). As part of the stand-down, sites were required to conduct a 100 percent physical inventory of all ACREM; enter it all into accountability; and conduct security procedure reviews and training. Further, the Department implemented a series of controls, including conducting periodic inventories, utilizing tamper proof devices on ACREM safes, and appointing trained custodians to be responsible for the material. After performance testing and validation that the required accountability systems were in place, ACREM operations at ORNL were approved for restart on August 10, 2004.Office of Inspector General
-
May 4, 2009Office of Management