More Resources
-
July 1, 2009Disposition of DOE Excess Depleted Uranium, Natural Uranium, and Low-Enriched UraniumOffice of NEPA Policy and Compliance
-
July 1, 2009Combined Community Communications Facility and Infrastructure Cleanup on the Fitzner/Eberhardt Arid Lands Ecology Reserve, Hanford Site, Richland, ...Office of NEPA Policy and Compliance
-
July 1, 2009U.S. Department of Energy Secretary Steven Chu announced today that projects by Basin Electric Power Cooperative and Hydrogen Energy International LLC have been selected for up to $408 million in funding from the American Recovery and Reinvestment Act.Hydrocarbons and Geothermal Energy Office
-
July 1, 2009Based on OE's review of the information concerning the proposal action, the NEPA compliance Officer has determined that the proposed action fits within the specified class of action, other regulatory requirements set forth are met, and proposed action is hereby categorically excluded from further NEPA review.Office of Electricity
-
July 1, 2009Based on OE's review of the information concerning the proposal action, the NEPA compliance Officer has determined that the proposed action fits within the specified class of action, other regulatory requirements set forth are met, and proposed action...Office of Electricity
-
July 1, 2009Sacramento Area Voltage Support ProjectOffice of NEPA Policy and Compliance
-
July 1, 2009The Department of Energy has conducted an environmental assessment that analyzed the potential environmental impacts associated with the design, construction, and startup of a SageGalss High Volume Manufacturing Facility on a 15-acre undeveloped parcel of land in Faribault, Minnesota.Office of NEPA Policy and Compliance
-
July 1, 2009Loan Guarantee for Sage Electrochromics SageGlass High Volume Manufacturing Facility in Faribault, MNOffice of NEPA Policy and Compliance
-
DocumentJuly 1, 2009This annex presents papers covering each of the 20 metrics identified in Section 2.1. These metric papers were prepared in advance of the main body of the report and collectively form its informational backbone. The list of metrics is derived from the material developed at the Smart Grid Implementation Workshop. The objective of the metric development process was to distill the best ideas into a small number of metrics with a reasonable chance of measurement and assessment.Office of Electricity