More Resources

  • September 29, 2009
    Electrical Isolations of 27 A-Area BuildingsCX(s) Applied: B1.27Date: 09/29/2009Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
    Office of NEPA Policy and Compliance
  • September 29, 2009
    Bonneville Power Administration (Bonneville) is responsible for marketing, selling and transmitting power produced from the Federal Columbia River Power System. Bonneville manages a significant transmission infrastructure, including about 15,000 miles of transmission lines and 300 substations in eight states. To fulfill its mission, Bonneville acquires transmission-related materials and equipment including transformers, circuit breakers, and steel and wood poles. From October 2002 through May 2008, Bonneville made approximately 5,200 transmission-related acquisitions totaling over $162 million. Bonneville acquired these materials through various types of contracts, including fixed price contracts and indefinite delivery/indefinite quantity contracts.
    Office of Inspector General
  • September 29, 2009
    Bonneville Power Administration's Acquisition of Transmission-Related Materials and Equipment
    Office of Inspector General
  • September 29, 2009
    Presidential permit authorizing Fraser Papers Inc to construct, operate, and maintain electric transmission facilities at the U.S-Canada border.
    Office of Electricity
  • September 29, 2009
    Office of Electricity
  • September 28, 2009
    Environmental cleanup of contaminated nuclear weapons manufacturing and test sites within the Department of Energy complex is estimated to generate approximately 419,000 cubic meters of mixed low-level waste.
    Office of Inspector General
  • September 28, 2009
    Audit of Mixed Low-Level Waste Disposal within the Department of Energy
    Office of Inspector General
  • September 28, 2009
    This document provides historical information about the Radiation Effects Research Foundation and its core research activities.
    Office of Environment, Health, Safety & Security
  • September 25, 2009
    Low Assay Plutonium Material Received from the Hanford Site
    Office of NEPA Policy and Compliance