More Resources
-
December 30, 2009Building 860 Modal Lab 111 ReconfigurationCX(s) Applied: B3.6Date: 12/30/2009Location(s): Albuquerque, New MexicoOffice(s): Sandia Site OfficeOffice of NEPA Policy and Compliance
-
December 30, 2009Cloud Radar, Balloon Launcher, Data System, Utility, and Road Upgrades for Atmospheric Radiation Measurement Climate Research Facility in Barrow, AlaskaCX(s) Applied: B1.3, B3.6, B4.13Date: 12/30/2009Location(s): Barrow, AlaskaOffice(s): Sandia Site Of...Office of NEPA Policy and Compliance
-
December 30, 2009Neutron imaging of metal hydride beds at Oak Ridge National Laboratory, Spallation Neutron SourceCX(s) Applied: B1.11, B1.13, B3.6Date: 12/30/2009Location(s): TennesseeOffice(s): Sandia Site OfficeOffice of NEPA Policy and Compliance
-
December 30, 2009Restoration of T-3-3CX(s) Applied: B6.1Date: 12/30/2009Location(s): Casper, WyomingOffice(s): RMOTCOffice of NEPA Policy and Compliance
-
December 30, 2009Geothermal Technologies ProgramCX(s) Applied: B3.1, B5.2Date: 12/30/2009Location(s): Casper, WyomingOffice(s): RMOTCOffice of NEPA Policy and Compliance
-
December 29, 2009Training Programs, Lighting Upgrades, Hire a Consultant, Energy Efficient Boiler InstallationCX(s) Applied: A9, A11, B5.1Date: 12/29/2009Location(s): Cheyenne, WyomingOffice(s): Energy Efficiency and Renewable EnergyOffice of NEPA Policy and Compliance
-
December 29, 2009Energy Efficiency Retrofits: Heating, Ventilation, Air Conditioning Upgrade, Building Controls, Lighting, Outreach and Education, and Energy Efficiency RemodelingCX(s) Applied: A9, B1.32, B2.5, B5.1Date: 12/29/2009Location(s): Peoria, AlabamaOffice(s):...Office of NEPA Policy and Compliance
-
DocumentDecember 29, 2009This is a request by PPG INDUSTRIES for a DOE waiver of domestic and foreign patent rights under agreement DE-EE0000167Office of the General Counsel
-
DocumentDecember 29, 2009This is a request by GED INTEGRATED SOLUTIONS for a DOE waiver of domestic and foreign patent rights under agreement DE-EE0000167Office of the General Counsel
-
December 29, 2009Project Number MS-09-116 - Structural Assessment of Big Hill Raw Water Intake Structure, Big Hill Brine Disposal Pump Pad and Bryan Mound Raw Water Intake StructureCX(s) Applied: B1.3Date: 12/29/2009Location(s): TexasOffice(s): Fossil Energy, Strategic...Office of NEPA Policy and Compliance