More Resources
-
February 17, 2026All applications and projectsOffice of International Affairs
-
February 17, 2026722-4A Habitability improvements.…Office of NEPA Policy and Compliance
-
DocumentFebruary 17, 2026Replace the flooring in rooms No. 1 and No. 2 of building 702-D.…Office of NEPA Policy and Compliance
-
February 17, 2026Habitability improvements in rooms No. 101, No. 102, No. 103, No. 104, and No. 105 in building No. 731-4N.…Office of NEPA Policy and Compliance
-
February 17, 2026Removal of equipment originally used by MOX from Building 221-21F to Excess/Salvage - Salvage Yard Transfer Building 741-1N. Preparation includes, …Office of NEPA Policy and Compliance
-
February 17, 2026The existing Buildings 264-H and 264-2H Safety Significant (SS) Fire Suppression Systems (FSS) need to be upgraded/qualified to meet Seismic Design…Office of NEPA Policy and Compliance
-
CX-035390: Replacement of Scanning Electron Microscope (SEM) in Inert Metallography Laboratory (IML)DocumentFebruary 17, 2026The JEOL JSM-6460LV Scanning Electron Microscope (SEM), along with all peripheral attachments, are to be removed and replaced with a new SEM. The n…Office of NEPA Policy and Compliance
-
February 17, 2026If required in NOFO or Award TermsOffice of International Affairs
-
February 17, 2026Hydrocarbons and Geothermal Energy Office
-
February 17, 2026Hydrocarbons and Geothermal Energy Office