More Resources

  • June 28, 2010
    California-Tribe-Grindstone Indian Rancheria of Wintun-WailakiCX(s) Applied: B2.5, B5.1Date: 06/28/2010Location(s): CaliforniaOffice(s): Energy Efficiency and Renewable Energy
    Office of NEPA Policy and Compliance
  • June 28, 2010
    Texas Propane Fleet Pilot Program (Summary Categorical Exclusion)CX(s) Applied: A7, B5.1Date: 06/28/2010Location(s): TexasOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
    Office of NEPA Policy and Compliance
  • June 28, 2010
    Consortium for Petroleum and Natural Gas Stripper WellsCX(s) Applied: A9Date: 06/28/2010Location(s): University Park, PennsylvaniaOffice(s): Fossil Energy, National Energy Technology Laboratory
    Office of NEPA Policy and Compliance
  • June 28, 2010
    AES ES Westover LLC, Project Dyno Electric Grid Stability Advanced Battery SystemsCX(s) Applied: B2.5Date: 06/28/2010Location(s): Johnson City, New YorkOffice(s): Loan Guarantee Program Office
    Office of NEPA Policy and Compliance
  • June 28, 2010
    A field test conducted by a U.S. Department of Energy team of regional partners has demonstrated that using carbon dioxide in an enhanced oil recovery method dubbed "huff-and-puff" can help assess the carbon sequestration potential of geologic formatio...
    Hydrocarbons and Geothermal Energy Office
  • June 28, 2010
    1) Technical consultant services to develop a strategy and implementation plan; 2) financial incentive program for homeowners to acquisition solar hot water heaters and replace lighting fixtures and inefficient appliances; 3) building retrofits which includes replacing air conditioning systems at the City Hall Building, Finance Department Building, Masso Rivera Municipal Theater, and Public Works Department; and 4) install solar photovoltaic systems (approximately 6.5 kW) at City Hall Building and the Finance Department Building.
    Office of NEPA Policy and Compliance
  • June 28, 2010
    Comments of Steele-Waseca Cooperative Electric onImplementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy
    Office of the General Counsel
  • June 28, 2010
    Comments of Meeker Cooperative Light and Power- Minnesota on Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy
    Office of the General Counsel
  • June 25, 2010
    The purpose of this Order is to establish DOE internal requirements and responsibilities for implementing the National Environmental Policy Act of 1969 (NEPA), the Council on Environmental Quality Regulations Implementing the Procedural Provisions of NEPA (40 CFR Parts 1500-1508), and the DOE NEPA Implementing Procedures (10 CFR Part 1021).
    Office of NEPA Policy and Compliance
  • June 25, 2010
    DOE Involvement in Consensus Negotiations for Energy Conservation Standards. The Department of Energy is supportive of outside parties' negotiations efforts to reach consensus on energy conservation standards and test procedures that can be presented for consideration by the Department However, neither the Department nor any of its contractors can: offer advice or suggestion on any standard or test procedure under consideration by outside parties; take a position on any standard or test procedure under consideration by outside parties; negotiate with outside parties; or participate in any way in discussions among outside parties.
    Office of the General Counsel