  • October 15, 2010
    California-City-Santa MariaCX(s) Applied: B1.32, B2.5, B5.1Date: 10/15/2010Location(s): Santa Maria, CaliforniaOffice(s): Energy Efficiency and Renewable Energy
    Office of NEPA Policy and Compliance
  • October 15, 2010
    Arizona-Tribe-Havasupai Indian TribeCX(s) Applied: B2.5, B5.1Date: 10/15/2010Location(s): ArizonaOffice(s): Energy Efficiency and Renewable Energy
    Office of NEPA Policy and Compliance
  • October 14, 2010
    Education
  • October 14, 2010
    The State of Illinois Weatherization Assistance Program
    Office of Inspector General
  • October 14, 2010
    High Yield Hybrid Cellulosic Ethanol Process Using High-Impact Feedstock for Commercialization by 2013CX(s) Applied: A9, B3.6Date: 10/14/2010Location(s): OregonOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
    Office of NEPA Policy and Compliance
  • October 14, 2010
    Low Cost High Concentration Photovoltaic Power Systems for Utility Power GenerationCX(s) Applied: B5.1Date: 10/14/2010Location(s): Aurora, CaliforniaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office
    Office of NEPA Policy and Compliance
  • October 14, 2010
    Carolina Blue Skies InitiativeCX(s) Applied: A1, B5.1Date: 10/14/2010Location(s): Indian Trail, North CarolinaOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
    Office of NEPA Policy and Compliance
  • October 14, 2010
    Transport Reactor Development Unit ModificationCX(s) Applied: B1.15, B3.6Date: 10/14/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory
    Office of NEPA Policy and Compliance
  • October 14, 2010
    Pursuant to Executive Order (EO) No. 10485, as amended by EO 12038, and 10 C.F.R. § 205.320 et seq., Northern Pass Transmission LLC (Northern Pass or the Applicant) hereby applies to the United States Department of Energy (DOE) for a Presidential Permit authorizing the construction, connection, operation, and maintenance of facilities for the transmission of electric energy at the international border between the United States and Canada. This application does not seek authority for any export of power from the United States. The information that follows is submitted in support of the Application.
    Office of Electricity