More Resources
-
October 19, 2010The Transmission Reliability research area focuses on two key areas: 1) Real-Time Grid Reliability Management and 2) Reliability and Markets. The first area develops monitoring and analysis tools that process synchrophasor data to enable real-time assessment of grid status and stability margins, with the goal of improving power system reliability and visibility through wide-area measurement and control. It is developing advanced technologies and tools to help create a resilient electric transmission system that can better detect disturbances, accommodate a variety of generation sources, and automatically reconfigure the grid to prevent widespread outages and/or rebalance the system. The second area focuses on developing a comprehensive set of integrated market and engineering design principles, tools, and technologies to support efficient, competitive electricity markets. These activities include modeling and simulating market rules, developing new computational methods, and performing real-time analysis of market behavior and its impact on market performance.Office of Electricity
-
October 19, 2010Idaho National Laboratory (INL) Routine Maintenance Activities (Overarching)CX(s) Applied: B1.3Date: 10/19/2010Location(s): IdahoOffice(s): Nuclear Energy, Idaho Operations OfficeOffice of NEPA Policy and Compliance
-
October 19, 2010Characterization of the Triassic Newark Basin of New York and New Jersey for Geologic Storage of Carbon DioxideCX(s) Applied: A9Date: 10/19/2010Location(s): Clarkstown, New YorkOffice(s): Fossil Energy, National Energy Technology LaboratoryOffice of NEPA Policy and Compliance
-
October 19, 2010Soil Amendment Product for Oilfield Brine Contaminated Soil ? Field Testing Part IICX(s) Applied: B3.7Date: 10/19/2010Location(s): Yale, OklahomaOffice(s): Fossil Energy, National Energy Technology LaboratoryOffice of NEPA Policy and Compliance
-
October 19, 2010PowerPoint slides on GE-Prolec CCE meeting regarding Docket No. EERE-2010-BT-CE-0014Office of the General Counsel
-
October 19, 2010PowerPoint slides on GE-Prolec CCE meeting regarding Docket No. EERE-2010-BT-CE-0014Office of the General Counsel
-
October 18, 2010HQ Occupational Safety and Health Program ProceduresOffice of Management
-
DocumentOctober 18, 2010Issued to Los Alamos National Security, LLC related to the Electrical Shock that occurred at Technical Area 16 at the Los Alamos National LaboratoryOffice of Enterprise Assessments
-
October 18, 2010Small Scale Electrical Power Generation from Low-Temperature Geothermal Process Water Utilized in a Mining OperationCX(s) Applied: A9, B3.1, B3.6Date: 10/18/2010Location(s): Reno, NevadaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Of...Office of NEPA Policy and Compliance