More Resources
-
November 4, 2010DOE referred the matter of Danby room air conditioner model DAC10507EE to the EPA for appropriate action after DOE testing showed that the model does not meet the ENERGY STAR specification.Office of the General Counsel
-
November 4, 2010In the Matter of Advanced Distributor Products (ADP) (air conditioning heat pumps), DOE Case Number 2010-SE-0304, Notice of Case Closure. After finding ADP products in violation of energy conservation standards, DOE send ADP a Notice of Noncompliance. ADP replied, asserting that its products were not sold in the US. Accordingly, DOE sends this letter to notify ADP that the matter is closed. The letter also includes information about certification requirements at the DOE, should the ADP situation change.Office of the General Counsel
-
November 3, 2010North Gila-Senator Wash Pole ReplacementCX(s) Applied: B4.6Date: 11/03/2010Location(s): Yuma County, ArizonaOffice(s): Western Area Power Administration-Desert Southwest RegionOffice of NEPA Policy and Compliance
-
November 3, 2010Trinity Line Cat Building InstallationCX(s) Applied: B1.15Date: 11/03/2010Location(s): Trinity County, CaliforniaOffice(s): Western Area Power Administration-Sierra Nevada RegionOffice of NEPA Policy and Compliance
-
November 3, 2010Assembly and Testing of Aboveground Antineutrino Detector, Add-On TaskCX(s) Applied: B3.6Date: 11/03/2010Location(s): CaliforniaOffice(s): Sandia Site OfficeOffice of NEPA Policy and Compliance
-
November 3, 2010Low-Level Mixed Waste Shipments in Fiscal Year 2011CX(s) Applied: B1.30Date: 11/03/2010Location(s): New MexicoOffice(s): Sandia Site OfficeOffice of NEPA Policy and Compliance
-
November 3, 2010High-Density Nanopore Array for Selective Biomolecular TransportDate: 11/03/2010Location(s): IllinoisOffice(s): Sandia Site OfficeOffice of NEPA Policy and Compliance
-
November 3, 2010Trinity Line Cat Building InstallationCX(s) Applied: B1.15Date: 11/03/2010Location(s): Trinity County, CaliforniaOffice(s): Western Area Power Administration-Sierra Nevada RegionOffice of NEPA Policy and Compliance
-
November 3, 2010Geothermal Incentive Program - Butler McCook MuseumCX(s) Applied: B5.1Date: 11/03/2010Location(s): ConnecticutOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology LaboratoryOffice of NEPA Policy and Compliance
-
November 3, 2010Small Mammal Sampling Near Waste Management Area C, 200 East Area, Hanford Site, Richland, WashingtonCX(s) Applied: B3.1Date: 11/03/2010Location(s): Richland, WashingtonOffice(s): Environmental Management, Office of River Protection-Richland OfficeOffice of NEPA Policy and Compliance