More Resources

  • January 26, 2011
    Magna E-Car Electric Drive System Components ManufacturingCX(s) Applied: A1, B1.24, B1.31Date: 01/26/2011Location(s): Grand Blanc, MichiganOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
    Office of NEPA Policy and Compliance
  • January 25, 2011
    In the Matter of Kenneth Grill (showerheads), DOE Case Number: 2011-SW-2902, Subpoena for Information and Production of Documents. Upon receipt of information indicating that showerheads do not satisfy water conservation standards, DOE issues this subpoena for information and documents to assist the inquiry into the product, and to request that Kenneth Grill maintain all records related to the products in question (even those not requested). Requests include persons involved, models in distribution, model information, a compliance statement and compliance report, as well as certification, model information, and testing, documents. Failure to reply may result in civil penalties.
    Office of the General Counsel
  • January 25, 2011
    San Juan Basin Energy Connect Project, San Juan County, New Mexico and La Plata County, Colorado
    Office of NEPA Policy and Compliance
  • January 25, 2011
    This whitepaper discusses ways to detect DNS exfiltration attempts based on current known methods, and provides recommendations for mitigation of this exposure.
    Office of Electricity
  • January 25, 2011
    This whitepaper discusses ways to detect DNS exfiltration attempts based on current known methods, and provides recommendations for mitigation of this exposure.
    Office of Electricity
  • January 25, 2011
    Rework Fire-rated Penetration Seal Per F-DCF-H-00591HB-Line Room 602A FloorCX(s) Applied: B2.2Date: 01/25/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
    Office of NEPA Policy and Compliance
  • January 25, 2011
    HB-Line Standpipe InstallationCX(s) Applied: B2.2Date: 01/25/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
    Office of NEPA Policy and Compliance
  • January 25, 2011
    Wooden Pole Inspection/TreatmentCX(s) Applied: B1.3Date: 01/25/2011Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office
    Office of NEPA Policy and Compliance
  • January 25, 2011
    Installation of Metering and Circuit Breaker at Powell 69-Kilovolt SubstationCX(s) Applied: B4.11Date: 01/25/2011Location(s): Page, ArizonaOffice(s): Western Area Power Administration-Colorado River Storage Project Management Center
    Office of NEPA Policy and Compliance
  • January 25, 2011
    Hex Block Shipment ProjectCX(s) Applied: B3.6Date: 01/25/2011Location(s): IdahoOffice(s): Nuclear Energy, Idaho Operations Office
    Office of NEPA Policy and Compliance