More Resources

  • April 19, 2011
    Center for Innovation in Energy and SustainabilityCX(s) Applied: A9Date: 04/19/2011Location(s): Sarasota, FloridaOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
    Office of NEPA Policy and Compliance
  • April 19, 2011
    Extended Pilot-Scale Testing of the Pratt and Whitney Rocketdyne Compact ReformerCX(s) Applied: B3.6Date: 04/19/2011Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory
    Office of NEPA Policy and Compliance
  • April 19, 2011
    National Biodiesel Foundation: Biodiesel Terminal Installation ProjectCX(s) Applied: B5.1Date: 04/19/2011Location(s): Duncombe, IowaOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
    Office of NEPA Policy and Compliance
  • April 19, 2011
    Replacement/Installation of Physical Access Control SystemCX(s) Applied: B1.7Date: 04/19/2011Location(s): Pittsburgh, PennsylvaniaOffice(s): Fossil Energy, National Energy Technology Laboratory
    Office of NEPA Policy and Compliance
  • April 19, 2011
    Midwest Region Alternative Fuels ProjectCX(s) Applied: B5.1Date: 04/19/2011Location(s): Lincoln, NebraskaOffice(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory
    Office of NEPA Policy and Compliance
  • April 19, 2011
    Characterization of Hydrocarbon Samples and/or Qualitative/Quantitative Analysis of Hydrocarbon MixturesCX(s) Applied: B3.6Date: 04/19/2011Location(s): Pittsburgh, PennsylvaniaOffice(s): Fossil Energy, National Energy Technology Laboratory
    Office of NEPA Policy and Compliance
  • April 19, 2011
    Fast Responding Voltage Regulator and Dynamic VAR Compensator with Direct Medium Voltage ConnectionCX(s) Applied: A1, A11, B3.6, B4.4, B5.1Date: 04/19/2011Location(s): San Jose, CaliforniaOffice(s): Electricity Delivery and Energy Reliability, National...
    Office of NEPA Policy and Compliance
  • April 19, 2011
    Fast Responding Voltage Regulator and Dynamic VAR Compensator with Direct Medium Voltage ConnectionCX(s) Applied: A1, A11, B4.4, B5.1Date: 04/19/2011Location(s): Durham, North CarolinaOffice(s): Electricity Delivery and Energy Reliability, National Ene...
    Office of NEPA Policy and Compliance
  • April 19, 2011
    Fast Responding Voltage Regulator and Dynamic VAR Compensator with Direct Medium Voltage ConnectionCX(s) Applied: A1, A11, B3.6, B4.4, B5.1Date: 04/19/2011Location(s): Raleigh, North CarolinaOffice(s): Electricity Delivery and Energy Reliability, Natio...
    Office of NEPA Policy and Compliance
  • April 19, 2011
    Construction and Operation of a Cask Processing Enclosure at the Transuranic Waste Processing Center on the Oak Ridge Reservation, Lenoir City, TennesseeCX(s) Applied: B1.13, B3.1, B6.6Date: 04/19/2011Location(s): Lenoir City, TennesseeOffice(s): Envir...
    Office of NEPA Policy and Compliance