Install pump and support lines to evacuate condensate from HVAC drain pan at the Criticality Control Overpack Pad in K-Area.…
This Categorical Exclusion Determination (CXD) addresses specific activities which can be performed at locations associated with Pantex Plant perta…
The Saltstone Process Room Ventilation system is to be permanently replaced due to its age and efficiency. To facilitate this replacement, it was d…
Remove pressure relief valves associated with a legacy compressed gas system.…
Valves are being added to the Nitric Acid Addition System at the Salt Waste Processing Facility (SWPF) for Personnel Radiological Dose reduction an…
The scope of this activity will be to install blanks to Vessel 6.8E and 7.7E for cooling water and steam at 221-H. Blanking cooling water and steam…
This Programmatic NEPA CX will cover all activities under Substation Stabilization Priority Projects, Repairs to Transmission Facilities, Priority …
Booster fan guardings in 221-H are inadequate and need to be replaced to address safety concerns.…
Remote Emergency Monitoring and Control System (REMACS) related equipment modifications are needed in 105-L. The old Remote Emergency Monitoring an…
Specifically, the scope includes constructing two new marine header pipelines supported by helical piles, installing a new road crossing pipeline a…