Upgrading 3 three-phase overcurrent protective reclosers and 4 single-phase overcurrent protective reclosers in, and near, Kelton Substation. All r…
Replacement of old poles (28), 13 transformers, 2250 ft of No. 1/0 acsr and 1350 ft of No. 4/0 acsr.…
The proposed work is to explore technical and economic pathways for replacing coal power plants and coal mines in Utah’s Coal Country with new ener…
New 46kV SF6 breaker and equipment for interconnection w PacifiCorp. Clear site, install new grounding grid, fabrication of steel structure, concre…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Fervo Energy Company (Fervo) to design, drill, complete, stimulate, …
The project includes modeling, engineering design, and laboratory work for a novel chemical looping concept to reduce carbon dioxide emissions from…
We will analyze the data collected at the test site using statistical and physics-based models, while also developing code.…
LM is proposing to conduct routine inspection, monitoring, and maintenance activities, and aerial surveys at the Mexican Hat, Utah, Disposal Site l…
The proposed work is to explore technical and economic pathways for replacing coal power plants and coal mines in Utah's Coal Country with new ener…