Extend 138kV transmission line from new 138kV Nortonville Switchyard to new 138kV/46kV North Substation Number 3 (total 13,200 feet). A 138kV ring …
The U.S. Department of Energy (DOE) is proposing to provide funding to OxEon Energy for the design, fabrication, installation, and analysis of manu…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Chemtronergy to develop an advanced metal-supported solid oxide elec…
Remove old overhead power lines and poles, trench and bore with underground conduit. Pull new lines into underground conduit and make connections t…
Upgrading 3 three-phase overcurrent protective reclosers and 4 single-phase overcurrent protective reclosers in, and near, Kelton Substation. All r…
Replacement of old poles (28), 13 transformers, 2250 ft of No. 1/0 acsr and 1350 ft of No. 4/0 acsr.…
The proposed work is to explore technical and economic pathways for replacing coal power plants and coal mines in Utah’s Coal Country with new ener…
New 46kV SF6 breaker and equipment for interconnection w PacifiCorp. Clear site, install new grounding grid, fabrication of steel structure, concre…
The U.S. Department of Energy (DOE) is proposing to provide federal funding to Fervo Energy Company (Fervo) to design, drill, complete, stimulate, …
The project includes modeling, engineering design, and laboratory work for a novel chemical looping concept to reduce carbon dioxide emissions from…