This Project is to install an automatic wet chemical fire suppression system over the griddle and stove in 246-2H Breakroom, Room 108. Fire Protect…
Funding will support the project team's small-scale research and development to integrate and enhance the transmission and distribution capacity of existing alternating current (AC) lines by blending with the high voltage direct current (DC) energy networks.
Funding will support the project team's small-scale research and development of a low-pressure and lower temperature, and fully electric, green ammonia (NH3) production photoreactor technology to advance dispatchable, energy and fuel infrastructures.
Bonneville Power Administration (BPA) proposes to install new media converters, fiber, and appurtenances at the patch panel inside of BPA's existin…
Funding will support the project team's small-scale research and development of a graphite digestion technology for the purpose of providing significant volume reduction of spent nuclear fuel from high temperature gas-cooled reactors.
We will be correcting and stabilizing 7 power poles and clearing the brush in the surrounding area to prevent further interference with the distrib…
Project involves converting existing overhead distribution line to underground within existing right of way.…
The Technologies to Emend and Obviate SYnthetic Nitrogen's Toll on Emissions (TEOSYNTE) program supports projects that focus on plant and microbial bio-design strategies that reduce the need to apply synthetic nitrogen fertilizer on corn and sorghum fields while maintaining crop yields.
Clean up all asbestos debris from cracked window glazing and encapsulate remaining asbestos material in place in L-Area.…
Install Receptacles in 105-L…