Installation of Two New Double-Wide Trailers in N-Area (722-2N/722-3N). This is a revision of OBU-N-2023-00035…
704-1N Sprinkler Head Addition/Relocation.…
105-C Assembly has some locations inside and outside with damaged transite panels (asbestos containing material). Cleanup is needed.…
Collect and dispose of asbestos containing material at the exterior assembly wall of 105-L.…
The subcontractor shall furnish all materials, tools, equipment, supplies, transportation, facilities, labor, supervision, and services required to…
Replace cubes and carpet on 3rd Floor East Engineering Area of 730-4B. The old communications UW will be removed and new electrical and communicati…
Subcontractor will provide roof retrofit at 618-G. The Subcontractor will not disturb the existing roof while performing this retrofit on 618-G.…
Installation of electric vehicle charging stations across SRS. …
This Project is to install an automatic wet chemical fire suppression system over the griddle and stove in 246-2H Breakroom, Room 108. Fire Protect…
Funding will support the project team's small-scale research and development to integrate and enhance the transmission and distribution capacity of existing alternating current (AC) lines by blending with the high voltage direct current (DC) energy networks.