EdgePower PV Forecasting and Load Control – anticipated Mar-Oct 2018 field test (as Period 4 of DOE SunShot Incubator project award)
August 3, 2017EdgePower PV Forecasting and Load Control – anticipated March-October 2018 field test (as Period 4 of DOE SunShot Incubator project award).