Fire Pumps Replacement at the K-Area Complex CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Prepare and Seal Exterior of Dry Room, Building 735-A CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
High Activity Waste Tank (HAWT) Disposition CX(s) Applied: B3.1 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Install Two Pre-engineered Canopies CX(s) Applied: B1.15 Date: 05/16/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
730-1B 3rd Floor Office Renovation CX(s) Applied: B1.3 Date: 05/08/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Excavate New Storm Drainage Ditch to Divert Storm Water from A-Area Coal Yard to Outfall A-11 Catch Basin CX(s) Applied: B6.1 Date: 05/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Replacement of A-Area Critical Fire Hydrants 3001, 3013, 3018, & 3032 CX(s) Applied: B1.3 Date: 05/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Electrical Upgrade at 681-3G CX(s) Applied: B1.3 Date: 05/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
288-F Ash Basin Landfill Fiscal Year 2012 Operating Plan CX(s) Applied: B6.1 Date: 05/02/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Zinc Traping Efficiency Testing CX(s) Applied: B3.6 Date: 05/02/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office