Non-Rad samples are analyzed on the Microtrac S3500 Particle Size Analyzer.…
This activity covers the tasks of receiving 7A or Croft SafDrums containing nuclear material from the K-Area Complex, unloading the shipping contai…
Support for the Salt Waste Processing Facility (SWPF)…
Convert Room B-070 in 773-A into a Vault-type Room (VTR). Connect the VTR to the existing 773-A ARGUS node.…
Collection and analyses of environmental samples. Rev.1 - extends the activity end date.…
The goal of this work is to produce novel materials using the ball milling method of alloying under different gaseous atmospheres. Revision 1: Thi…
The first product evaporation (1CU) and second product evaporation (2EU) streams are currently equipped with OptiMax Model 6000 Colorimeters to mea…
HVAC units in buildings 781-A and 749-A will be replaced due to age and degradation. Replacement D and R and installation activities will be comple…
The aboveground make-up water piping behind 285-H basin is out of service and creates an unnecessary trip hazard and leak point. This work removes …
The scope of work for this project involves the refurbishment of the women's changing room on the first level of 221-H. The tasks include wall repa…