Spence Substation Stage 02 Construction…
BPA proposes to replace an engine generator (EG) and associated EG building and fuel tank and to upgrade electrical grounding at BPA’s Sycan III Co…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to complete Stage 04 maintenance at its Poncha (PON)…
Oregon State University proposes to develop an experimental database of progressive benchmarks with increasing complexity, to be able to validate s…
BPA proposes to make modifications to the parking area at Raver Substation.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace Structures 0/1 to 2/7 on its West Portal-Stillwater Tap …
Synthesize and evaluate an amine based air capture adsorbent. This involves laboratory-scale research.…
Purpose: To ensure the safety and reliability of the bulk electric system.…
Bonneville Power Administration (BPA) proposes to partially compensate Puget Sound Energy (PSE) to bury approximately 230 feet of overhead electric…
Replace the existing wood structures with galvanized steel structures and replace the conductor, shield wire and grounding and associated transmiss…