Removal of all existing HVAC air handling systems throughout the building and the installation of one new packaged air handling unit installed on g…
The proposed work activity is to remove a recent modification from the Advanced Test Reactor (ATR) Control room air conditioner, 670-HVA-2. The mod…
The Mission Support Contractor (MSC) and its subcontractors perform installation or modification of air conditioning systems required for temperatu…
The scope of the G Building East Renovation Project includes asbestos abatement of window caulking, floor tile and mastic.
Line reactors are being added to Air Handling Unit AHU-907.…
The subcontractor shall provide all materials, tools, equipment, supplies, transportation, facilities, labor, supervision and services required to …
Activities addressed by this standard NEPA Review Form include: Routine maintenance and repair activities, Plant rearrangements and/or building mo…
The Desert Southwest Region (DSW) routinely operates and maintains more than 243 substations, switch-yards, and communication sites. Routine mainte…
Perform replacement of Rooftop Units (RTUs) #3, 4, 6, and 7B on the roof of Building 703-47A. The disconnect switch for RTU 9B will be replaced.
The scope of the Battery Building Modification project includes an expansion of the building, replacement of electrical equipment and roofing membr…