Western Area Power Administration (WAPA), Rocky Mountain Region, proposes to conduct routine herbicide application for vegetation management at the…
The Building 250-S roof is to be replaced.…
Replace the packing in Return Pump #3 at 281-2H.…
Augusta Industrial to pressure wash internal cooling tower basins at 785-1B and 785-A.…
Room 169 is being modified to accommodate office spaces throughout the room, resulting in deficient notification device coverage as required byNFPA…
Install backboards in phone room in 722-A.…
Subcontractor will provide roof repairs at 704-16B.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Casper-Glendo No…
Scope of this work is to repair, reroof and recoat some of the roofs of buildings 234-H and 249-H.…
Evaluate and repair crane solenoid and breaker that is intermittenly tripping on low lift crane at 681-3G.…