Subcontractor will perform a roof replacement at 731-N. The Subcontractor "will" disturb the existing roof while performing this roof replacement o…
SRNL will perform laboratory experimentation to determine the flowsheet parameters necessary to safely and efficiently dissolve used nuclear fuels …
The Casting Prototype System is a vacuum induction melt (VIM) that will be used to melt surrogate material.…
This EEC outlines an extraction method for the analysis of organo-species in environmental samples (i.e. soil, sediment, surface water, ground wate…
The objective of this R and D project is to design and construct an electromagnetic (EM)-assisted alkaline electrochemical reactor for the conversi…
The project involves replacing existing meters with new, advanced meters and metering equipment throughout SIEC's service territory. The installati…
Installation of long duration battery energy storage system (LD-BESS), grid-forming inverter, charge controller, and all necessary electrical equip…
Construct 0.76 mi. of 3-phase line to connect two circuits. Install a 3000kVa transformer to connect two circuits. Convert 1.5 mi. of 1-phase lin…
MVEA to reconstruct nine and one-half (9.5) miles of No. 8 CopperWeld single-phase conductor to No. 2 ACSR single-phase overhead conductor. CopperW…
Characterization activities for CO2 storage complex to include: drilling stratigraphic test well, well logging, well coring, lab experiments, site …