Relocation, spacer cable technology, and converting overhead distribution from overhead to underground in areas in Ohio with trees out of right-of-…
1) Rebuild 4,221 feet of overhead power lines behind secondary dune line to protect from encroaching ocean and remove existing poles. 2) Install 2,…
Electrical equipment installation on existing overhead lines and automation of restoration devices.…
Upgrading substation transformer and associated equipment within existing fencing of distribution substation. Also adding animal-deterrent fencing …
BPA would fund the Coeur d’Alene Tribe to complete construction of a support building to store the equipment utilized to conduct ongoing wildlife m…
Bonneville Power Administration (BPA) is proposing to replace five deteriorating wood pole structures, any associated hardware and guys, and electr…
Bonneville Power Administration (BPA) proposes to replace the heating, ventilation, and air conditioning (HVAC) system at BPA’s John Day Substation…
LM is proposing to move a Conex storage box approximately 25 miles along Colorado State Highways 90 and 141 from the Uranium Leasing Program (ULP) …
Implement remote sensing solutions for vegetation, replace transmission conducts and poles, replace FIR with steel, replace insulators, static line…
The Klickitat will upgrade approximately 3,500 feet of old, outdated single phase distribution line to an underground three phase line. These upgra…