Installation of Mechanical and Electrical modifications necessary for R and D, Advanced Materials Recovery Instruments in 773-A, D-0150. …
Bonneville Power Administration (BPA) proposes to replace in-kind wood pole structures and associated structural/electrical components (e.g. cross …
This project will consist of the purchase and installation of a dual-fired, natural gas and hot water, double stage absorption chiller.…
The proposed activity is to repair the grouted concrete cracks in the exterior walls of Building 772-F…
Titrations of acids and bases will be performed using a ThermoScientific Auto Titrator.…
Mold Coating testing is to determine which mold coating is the best and how much will need to be applied.…
H-Canyon's processing of Spent Nuclear Fuel (SNF) and Non-Aluminum SNF (NASNF) fuel will require the SRNL's Nuclear and Chemical Processing (N and …
Centrifugal contactors will be installed in the existing mock-up facility in 716-4A to test for facility acceptance testing.…
Simulant waste streams will be flowed through varying solids (material, particle size, etc.) in order to measure the sorption of contaminants.…