Photo

Photo Title
The cleanup site was carefully surveyed using state of the art landscape survey instruments prior to soil removal.
Photo

Photo Title
Before beginning soil excavation, workers prepared the site and staged equipment.
Photo

Photo Title
The steep terrain required careful maneuvering of the heavy equipment.
Photo

Photo Title
When excavated, soil contaminated with low levels of plutonium was loaded into double-lined waste bags.
Photo

Photo Title
Bags of contaminated soil were then sealed and screened.
Photo

Photo Title
Once sealed and screened, the bags of contaminated soil were transported to the top of the canyon and secured on flatbed trucks.
Photo

Photo Title
The bags of contaminated soil were then transferred to a DOE waste staging area before shipment to a licensed off-site disposal
Photo

Photo Title
Following cleanup, the site was verified to have met regulatory standards and restored to natural conditions.
Photo

Photo Title
The cleanup site was carefully surveyed using state of the art landscape survey instruments prior to soil removal.