
Planned and existing polymer electrolyte membrane (PEM), solid oxide electrolyzer cell (SOEC), and alkaline electrolyzer installations above 1 MW in the United States as of May 2023. Bubbles are not drawn to scale and are for illustrative purposes only.
Source: Arjona, V., DOE Hydrogen Program Record 23003, June 2023.