730-B Evaluate/correct/repair skylight in lobby.…
Existing 789-2B conventional Notifier SFP 10UD Fire Alarm Control Panel (FACP) is obsolete, spare parts are no longer available, and needs to be re…
Construction to replace furnace exhaust pipes for heaters No. 42, No. 43, No. 44, and No. 46 in building 717-3N.…
Install metal roofing panels and reattaching metal trim on the roof of building 713-1N.…
Surveys the linearity of the electrodes, as well as determining the detection limits in various matrices. Analysis will be done with an Orion Versa…
This EEC covers all maintenance activities performed by Savannah River Tritium Enterprise (SRTE) organizations that have the potential to disturb g…
Perform testing of a hydride-dehydride and casting (HYDEC) engineering development system installed in the 786-A engineering development laboratory…
Use gelatin to remove colloidal silica from aqueous salt simulants.…
This work is to inform design of larger scale experiments and provide a better understanding of the interactions between pyrophoric residue and fla…
CM 4443 Install flashing on east end at 711-1N.…