I and M intends to install DACR typically in the form of "smart" reclosers on the distribution grid across its Indiana territory which will provide…
The project will upgrade three 4 kV circuits to more dependable 12 kV circuits, with replacement of poles, hardware, and transformers that have rea…
STRiDE will install 4MW/16MWh of battery storage. System would be installed on an appx. 1/4 acre area adjacent to an existing substation site.…
Installation of a 3 MW, 12 MWH battery energy storage system (BESS), pole replacement, FLISR device installation, and fiber-ethernet switch install…
Enhancing Rural Resiliency and Efficiency - Replacing 1.93 miles of single phase copper line with new three phase 1/0 ACSR.…
The U.S. Department of Energy (DOE) is proposing to provide funding to Purdue University Northwest (Purdue) for the analysis, design, fabrication, …
The U.S. Department of Energy (DOE) is proposing to provide funding to Purdue University (Purdue) to design, develop, fabricate, and field test a s…