2-D and 3-D seismic surveys, controlled source electromagnetic survey, collect gravity and magnetic data. …
Award Number: DE-AC36-08GO28308, CX(s) Applied: A9, B3.1, National Renewable Energy Office, Location(s): CO, Office(s): Golden Field Office
Bonneville Power Administration (BPA) proposes to provide funds to the Columbia Land Trust (CLT) to work with local and regional partners to comple…
Complete detailed characterization of Kemper County Energy Facility storage complex (Drill 3 charac. wells, perform 3D seismic, obtain UIC Class VI…
Evaluate uranium concentrations in the alluvial groundwater downstream of the northern institutional control boundary of the Naturita, Colorado, Ur…
Install aerial survey quality control monuments for aerial survey activities at the Falls City, Texas, Disposal Site.…
The research project investigates the biogeochemical processes related to metal removal and toxicity reduction in the A-01 and H-02 constructed wet…
Administrative and project management activities. Computer modeling, analysis, engineering, and design. Laboratory testing. Prototype heater tool c…
Remediation activities have been completed at several sites within A- and M-Areas.…
Install aerial survey quality control monuments for aerial survey activities at the Slick Rock, Colorado, Uranium Mill Tailings Radiation Control A…