Meson Hill Well Abandonment CX CX(s) Applied: B3.1Date: 07/24/2015 Location(s): IllinoisOffices(s): Fermi Site Office
Soil Investigation East of the Low Point Pump Pit (i.e., Building 511-S) CX(s) Applied: B3.1Date: 07/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Rotor-mounted Bat Impact Mitigation System Award Number: DE-EE0007034 CX(s) Applied: A9, B3.1, B3.3 Wind Energy Technologies Office Date: 07/16/2015 Location(s): CA Office(s): Golden Field Office
Wind Forecasting Improvement Project In Complex Terrain Near The Columbia River Gorge Award Number: DE-EE0006898 CX(s) Applied: A9, B3.1 Wind Energy Technologies Office Date: 07/15/2015 Location(s): CO Office(s): Golden Field Office
Wind Forecast Improvement Project 2 (WFIP2), Walla Walla (Monitoring Trailer), ASO-CX-315 CX(s) Applied: B3.1Date: 07/15/2015 Location(s): IllinoisOffices(s): Argonne Site Office
Wind Forecast Improvement Project 2 (WFIP2), Yakima (Monitoring Trailer), ASO-CX-314 CX(s) Applied: B3.1Date: 07/15/2015 Location(s): IllinoisOffices(s): Argonne Site Office
Wind Forecast Improvement Project 2 (WFIP2), Goldendale (Monitoring Trailer), ASO-CX-316 CX(s) Applied: B3.1Date: 07/15/2015 Location(s): IllinoisOffices(s): Argonne Site Office
NREL- Wind Forecast Improvement Project in Complex Terrain (WFIP2) - NREL Tracking No. 15-020 Award Number: DE-AC36-08GO28308 CX(s) Applied: A9, A11, B3.1 National Renewable Energy Laboratory (NREL) Date: 07/13/15 Location(s): OR Office(s): Go...
Waste To Wisdom: Utilizing Forest Residues For The Production Of Bioenergy And Biobased Products Award Number: DE-EE0006297 CX(s) Applied: A9, B3.1 Bioenergy Technologies Office Date: 07/06/2015 Location(s): CA Office(s): Golden Field Office
Installation of Sentinel Wells for the A-2 Air Stripper System CX(s) Applied: B3.1Date: 06/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office