Replacement of the analog Automatic Transfer Control system with a digital electronic Transfer Control System.…
Tillamook Substation is an existing BPA facility in Tillamook County, Oregon. The proposed project would replace electrical equipment experiencing …
This effort will upgrade existing PERTT infrastructure with an IT/OT cyber/control layer for purposes of energy-related cyber-physical critical inf…
The recipient will use integration of modernized software: distribution management system (ADMS), distributed energy resources management system(DE…
701-2K is currently on The Electronic Safeguards and Security System (E3S) and operating beyond its intended lifetime. K-Area Facility is funding A…
meter replacements, communications infrastructure, and software upgrades, including pilot systems and testing.…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to Ava Community Energy Authority to design and in…
Anomaly detection for distribution systems with devices and microgrids, model and data-driven attack resilient control algorithms, education and wo…
Comprehensive identification of cyberattack space at both device and network levels
Bonneville Power Administration (BPA) proposes required maintenance at BPA's existing Bellingham Substation in Whatcom County, Washington. The prop…