Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to permanently widen the existing northwest access road at Ault (AU…
This EEC covers various routine maintenance activities that occur in the buildings within the MOX Complex Area.…
The HANM Gas Blend turbo pump and controller will be replaced per design change package.…
This activity will upgrades the electrical system at the 901-H Segregation Cooling Water Valve Pit.…
Recovering refrigerant from non-radiological appliances in L-Area that contain less than 5lbs refrigerant at full charge.…
Replacement of 701-2K Roof.…
Repair and replace asphalt at Buildings 713-N and 716-N.…
Roofing Repairs at 105-K, 34 Far Side.…
Replace pipe flange on the HM Trailer east of 772-F.…
This work scope is to improve the drainage around the west sides of 772-F and 772-1F.…