The scope of the Bettis J-Building Mezzanine Project is to design, fabricate, and install a mezzanine with two sets of access stairs around the inside perimeter of the Bettis J-Building to accommodate relocation and upgrade of the large hot isostatic...
DOE-ORP and BNI propose development of new land areas for infrastructure supporting construction of the HLW Facility.…
The US Army Corps of Engineers (USACE) will subcontract the final design and construction of Barricade 9 Entry Control Facility (ECF) replacement.…
This project scope describes the install of a new distribution water line extension from CFA to the INL Live Fire Range to supply the new Consolida…
The proposed project would be for the Nevada National Security Site Management and Operating (M and O) Contractor to install up to five (5) USAF mo…
Phase 1: Design...Phase 2: Construction…
The proposed stormwater and industrial water improvements are designed to meet current industrial permit limits and prepare for future development at the Bettis Laboratory Site.
Two Quonset Huts are to be installed in Z-Area to support construction activities.…
The Bonneville Power Administration (BPA) proposes to relocate the calibration, metrology, and chemistry laboratories from the aging South Ampere B…
A new Nurse Station is to be installed and operated in Building 766-H, Rooms 1061 and 1066F for Savannah River Mission Completion employees.…